LIVE
Chatham Maritime Marina
Life long sailor, cruising and some local club racing. Completed round the UK in 2017 (May to August), anticlockwise from Medway, shorter route through Caledonian Canal and east Ireland coast. Enjoy sailing Holland and North French coast.
209
NM
Total Distance
12
Days
Time at Sea
ICC
The RYASteve Smith, Daphne Smith & 2 others
Yesterday at 11:20
A very hot day, went over three aqueducts today. Fantastic scenery and lovely houses on the canal banks some with boat docks. Marina berth in Grou, scan QR code on pontoon and complete on line form and pay on line with credit card all in English. Email received with code for shower etc. €25 for boat and 4 People.
5
18.6
NM
4h 16m
Franeker to Grou, The Netherlands
Steve Smith, Daphne Smith & 2 others
Monday at 10:01
Very warm day, tee shirt and shorts. Spot the Robot lawnmower reached a new level at start of passage. See video Steve and Brian took turns in paying bridge fee by Clog. Many bridges today. Berthing Fee €18 including water, Electricity and shower facilities. Facilities clean 5*, 50c coin gives very long shower, temperature 5*, shower head fixed hight, good flow and spread, cubical standard size, wet clothes possible for unwary/rookie shower user, shelf for shoes and bag. Excellent meal, drinks and deserts plus tip. €150 for four of us. In hotel De Stadsherberg. Web site allows table reservation, worked well. Plus English menu available. https://www.stadsherbergfraneker.nl Visited Amazing planetarium. The oldest working one in the world completed in 1781 made from wood and pegs driven by a weights and pendulum. A UNESCO world Heritage site granted in 2023. https://whc.unesco.org/en/list/1683/
3
23.6
NM
5h 24m
Dokkum to Franeker, The Netherlands
Day 3 Tourism
Manual Entry
Sunday at 00:00
1
NM
20h 0m
Holland
Steve Smith, Gill Warwick & 1 other
Saturday at 14:21
A warm, windy overcast day, canals were not very busy, met extremely large barge on the corner which caused some excitement. Went through two bridges where we had to pay Steve feeding money into a swinging clog from the Bridge operator. Video is available. On arrival, Dokkhum it was quite busy. But we found a berth at the end of the line. Mooring Fee at Dokkum for two nights four people plus Electricity €36.30 Total engine hours for day Start 4017 End 4020
5
4.8
NM
1h 31m
Burdaard to Dokkum, The Netherlands
Steve Smith, Brian Warwick & 1 other
Saturday at 10:57
Stopped for Lunch in the middle of a village between two bridges and adjacent an authentic wind mill which was operational, the sails provide power to grind grain or drive a saw mill.
1
6.7
NM
2h 27m
Hoek to Burdaard, The Netherlands
Steve Smith, Brian Warwick & 1 other
Friday at 11:37
Traversed Three Aqueducts, four lifting bridges. Berthing €29 for berth, electricity and four adults. Engine hours 4013 to 4016 Note error in auto log we started from RFU Jachtspecialist BV - It String 9 - 9011 TA - Jirnsum Ended route at Leeuwarden
5
13.5
NM
4h 11m
Grou to Hoek, The Netherlands
A great lunch stop little Bay interesting rocks, all swam with snorkels amazing fish Steve Nikita and T how to go paddle boarding. Nikita was really taken with it.
20.1
NM
6h 37m
Kálymnos to Kos, Greece
Variable from no wind, shifting wind direction and 20Kts, Had to abort first planned stop ( Leips 2 Vlychadia Beach) no buoys available and too crowded to anchor in the gusty wind. So replanned and went on to Kalymnos harbour. Trouble with foresail furling again, had to drop it to the deck. Got complements from dock master for our perfect right first time med stern too mooring. Dock masters work on a tip basis for guiding you in and taking lines. Our man was excellent, big beard. Looks a bit like animal (S it’s Smart esame Street). Gave him €20 Barbour fees paid separately was €9.
32.7
NM
6h 5m
Leipsoí to Kálymnos, Greece
Mixture of sailing and motor Sailing. Med mooring in harbour, tricky conditions strong gusting cross wind. Berthing cost €20.45 for nights stay, electricity and Water.
17.4
NM
3h 50m
Agía Marína to Leipsoí, Greece