Salcombe Harbour
4,009
NM
Total Distance
73
Days
Time at Sea
All on hydrovane! 9-14kts of wind
57.8
NM
9h 41m
Morro del Jable to Stadtzentrum, Spain
6-10kts Mark got the boat going really well close hauled and we managed to sail where everyone else was motoring. Saw dust tornado on land, a pod of small whales, a couple of flying fish and caught a skipjack
1
23.3
NM
5h 21m
Gran Tarajal to Playa Risco el Paso, Spain
won't let me snip the voyage. DDW, mostly fine, occasionally going 8kn, occasionally 3kn, had to motor the last hr
30.1
NM
10h 3m
Enguias to Ponta de Sao Lourenco, Portugal
good winds, reaching, then downwind then upwind then a long reach at the end after a half days motoring. Mostly F5 with the red code sail up most of the time. Sailing at night for comfort, downwind where possible.
595.3
NM
4 days 1 hours
Nazaré to Enguias, Portugal
Thankless slow motor
64.8
NM
11h 43m
Matosinhos to Figueira da Foz, Portugal
Downwind, poled out for 2/3 of the way after a slow start under motor. arrived to a very industrial area
upwind the whole way, 26kn true towards the end. first anchorage too windy, anchored in lee of island. second anchorage busy, plan to move at 8pm when wind drops
20.1
NM
4h 46m
Combarro to Punta de San Martín, Spain