Salcombe Harbour
2,952
NM
Total Distance
62
Days
Time at Sea
won't let me snip the voyage. DDW, mostly fine, occasionally going 8kn, occasionally 3kn, had to motor the last hr
30.1
NM
10h 3m
Enguias to Ponta de Sao Lourenco, Portugal
good winds, reaching, then downwind then upwind then a long reach at the end after a half days motoring. Mostly F5 with the red code sail up most of the time. Sailing at night for comfort, downwind where possible.
595.3
NM
4 days 1 hours
Nazaré to Enguias, Portugal
Thankless slow motor
64.8
NM
11h 43m
Matosinhos to Figueira da Foz, Portugal
Downwind, poled out for 2/3 of the way after a slow start under motor. arrived to a very industrial area
upwind the whole way, 26kn true towards the end. first anchorage too windy, anchored in lee of island. second anchorage busy, plan to move at 8pm when wind drops
20.1
NM
4h 46m
Combarro to Punta de San Martín, Spain
Lovely downwind sail with confusing windshifts in Ria de Pontevedra
12.9
NM
3h 16m
Praia de Melide to Combarro, Spain
15-kn aft quarter sail to start, wind steadily dropped and had to motor second half, picking way between rocks at entrance to Ria Arousa
24.9
NM
5h 0m
Bornalle to Palmeira, Spain
Sailed half motored half. 4kn in 7kn of wind
10
NM
2h 20m
North Atlantic Ocean to San Francisco, Spain