
Blah
The first half of the transit was with gentle sea and wind just enough to be close hauled. The second half saw an increase in sea mostly 3m with occasional 5m and wind mostly 20 kts occasionally 30kts on the bow Estimated time for the trip 46hrs actually took 54hrs
2

07.00 Slipped lines heading for bay entrance 08.15 Cleared bay set course for Sardinia 09.00 Motorsailing, engine at 1300rpm full Genny and 2/3 main Speed 6.5kts, Sea Calm 11.00 Electrical fault on starter battery system returning to Pollenca 15.30 Arrived back, moored, engine off.
