
started in Borkum 0kts wind found water in the bilge above Schiermonnikoog technical troubleshooting found crack in hose of engine cooling water exhaust. towards texel wind became 20kts had 1 big shower ( weather front) down the NL coast wind direction changed in favor of heading VHF at Rotterdam port (Sector Maasmond) eengine start problems, low battery. locks at flushing bridges from flushing to Middelburg locks at Veere. left borkum around 1200 arrived Veere approx 1200 2 days later
2

Reede, Germany to Veere, The Netherlands
20-25 kts on marker and ijsselmeer on motor throug waddenzee from lorentzsluis to terschelling mond. start with 2 reefs at Terschelling towards morning wind dropped to 15-20kts so took reefs out at dawn.
2

Amsterdam, The Netherlands to Reede, Germany
steady 25-30kts winds, gusts 34 running with the wind buletali in place 2 reefs in main gib rolled up reef crew of 3, edwin, ernst, jochen
1

Neeltje Jans to Amsterdam, The Netherlands
up to 30knts wind plan was helgoland but looking at forecast the next days were not any different so decided to anchor and review plan tomorrow morning

Veere to Neeltje Jans, The Netherlands
- 3 days 2 nights straight sailing - 3 nights layover in Stonehaven due to fog and no/poor wind - 30hrs Stonehaven to Kirkwall started with 1 reef, ended with 2. used code-0 for the first part, rail broke, later (after Peterhead) only main sail due to wind and waves from rear.
1

Zierikzee, The Netherlands to Kirkwall, United Kingdom
Jo Chen, Ido Brandalise & 1 other
31 May 2026 at 04:43

Church End, United Kingdom to Zierikzee, The Netherlands
Jo Chen, Ido Brandalise & 1 other
28 May 2026 at 13:51

North Sea, The Netherlands to Ipswich, United Kingdom

Woolverstone, United Kingdom to Sophiahaven, The Netherlands