6 November 2025 at 07:00
Nongsa, Indonesia to Kampung Kuah, Malaysia
6/11 - Nongsa Point Marina Arrive 8/11 - Nongsa Point Batam to Iskandar Puteri Malaysia 53Nm Wind - NW 5-6 increasing to 16 Sea state - 1 metre Weather - Fair Motor/Jib Engine overheated. Height issue Second Link Bridge 16-17/11 Iskander Puteri to Admiral Marina Overnight Motor/jib Navigation through lots of ships Sea 0.5 m Weather fair 23/11 - Admiral Marina to Royal Selangor Left in rain storm - very wet journey No wind - motor Sea state 1m Arrived in torrential rain 25/11 - Royal Selangor Yacht Club to Coral Beach Pangkor Debris and river current big concern in river Motor/jib/Main sail Sea state 0.5m to 1m Weather fair Sea debris off Pulah Tengah Swell increased to 2m 26/11 - Coral Beach Pangkor to Pangkor Marina Motor Sea 1-2metre Wind 15 - 20kts 4/12 - Pangkor Marina to Pulau Talang Motor/jib Poor visibility but cleared Sea 0.5m Fishing buoys lots Anchor 5/12 - Pulau Talang - Pulau Kendi Motor/jib Sea calm Fishing Buoys and boats lots Avoidance action taken for trawling fishing boat. Anchor 7/12 - Palau Kendi - Jerejak Motor Sea 0.5 Anchor 8/12 - Jerejak - Straits Key Marina Penang Motor Passing under Penang Bridge Sea 0.5 Anchor 9/12 - Dingy motor fails 10/12 - Straits Key Marina Penang - Pulau Singa Besar Motor/jib Sail with reef Wind 20kts Sea 1.5m Avoiding action for trawler Motor to anchor Anchor 12/12 - Pulau Singa Besar South Anchor to North Anchor to Rebak No wind Manual Helm all the way. Motor to Anchor Sea calm 15/12 - Rebak to Royal Yacht Club Langkawi Yacht handling practice Wind 20-25kts Sea 0.5 - 1 metre Manual Helm all the way
Download the SailTies app to leave a comment on this voyage.